Scenarios & Assumptions

SIMULATED DATACalibrated Synthetic Model

All scenarios use synthetic mathematical models calibrated for solar microgrids in rural Madagascar. Not real-time telemetry from an operating village.

SIMULATED DATA

Scenarios & Assumptions

Pre-configured climate and demand stress events for microgrid resilience testing.

NominalActive
READY

Sunny day nominal profile with 0 unserved demand

Solar PV Capacity40 kW
Battery Storage120 kWh (60%)
Stress ProfileNominal 24h solar & demand profile
ID: baselineOpen in Simulation
Climate Stress
READY

2h solar drop at 13-15h with 35% initial battery SoC

Solar PV Capacity40 kW
Battery Storage120 kWh (35%)
Stress Profile-40% solar (13:00–15:00)
ID: cloudy_afternoonOpen in Simulation
Demand Surge
READY

17-22h evening peak demand surge across all sectors

Solar PV Capacity40 kW
Battery Storage120 kWh (60%)
Stress Profile+30% demand (17:00–22:00)
ID: high_demandOpen in Simulation
Storage Constraint
READY

Half normal storage capacity with 30% initial reserve

Solar PV Capacity40 kW
Battery Storage60 kWh (30%)
Stress ProfileNominal 24h solar & demand profile
ID: battery_constraintOpen in Simulation
Climate Stress
READY

Severe 4h solar deficit from 11-15h with 25% battery

Solar PV Capacity40 kW
Battery Storage120 kWh (25%)
Stress Profile-60% solar (11:00–15:00)
ID: essential_stressOpen in Simulation
Demand Surge
READY

Simulated meter divergence (>25% for 4h) in market sector (verification required)

Solar PV Capacity40 kW
Battery Storage120 kWh (60%)
Stress ProfileNominal 24h solar & demand profile
ID: meter_anomalyOpen in Simulation

Assumptions Inspector

Baseline 24h Nominal (baseline)

Inspect physics constraints and adjust microgrid operating conditions

Editable Operating Parameters
0 %
0 %90 %
1 ×
0.5 ×2 ×
120 kWh
1 kWh2000 kWh
60 %
0 %100 %
Fixed Engine Invariants
Enforced by @mitsinjo/engine
Simulation Horizon24 h (1 h step)
Charge / Discharge Efficiency95% / 95%
Min SoC Reserve20.0%
Max Charge / Discharge25 kW / 25 kW
Village Sectors & Resilience Tiers
Health Clinic80% critical demand
Critical
Water Pumping Station30% critical demand · Shiftable load
High
Primary School10% critical demand
Medium
Village Households20% critical demand
Medium
Local Market & Artisans10% critical demand
Low
Small Factory0% critical demand · Shiftable load
Low

Latest-Run Parameter Summary

Not run yet

Simulation has not been run for this scenario yet. Open in simulation to compute metrics.